Overview
We made it our mission to create an entirely new product category
in water pipe leakage repair, revolutionizing the way
significant water loss from leakage is addressed.
That’s why we developed our TALR solution that encompasses the technology, methodology, operational delivery, effectiveness and the capability to dramatically reduce water leakage in water mains and associated service pipes.
Founded in 2007 by a group of 4 highly skilled PhD technologists who are experts in hydraulics, chemical / metallic / plastic materials, and drilling, Curapipe developed its TALR solution following a rigorous R&D cycle of 40 man-years with the active support of London’s Thames Water Utility and the Jerusalem Water Utility.
TALR is gaining acceptance in many corners of the world due to the growing global challenge of water scarcity exacerbated by climate change.